ARDEX Tile and Stone Products deliver Gold at 2012 London Olympic Aquatics Centre
The most decorated Olympian of all time earned his 22nd medal in the iconic London Olympics Aquatics Centre in Olympic Park, London. The 260,000 square-foot center was made possible with ARDEX Tile and Stone Installation Products which bonded approximately 866,000 ceramic tiles in the pools, poolside and changing rooms; 180,000 tiles lined just the pools.
“ARDEX Tile and Stone Installation Products (TSIP) have been specified in many high-profile swimming pools, but to win the contract for the Aquatics Centre has been a great achievement, and a testimony to ARDEX’s ‘gold standard’ product range and support,” said Harrison Gardner, ARDEX Americas TSIP Manager. “The feedback from the installation team was extremely positive, and the end result is stunning. The Aquatics Centre is an amazing facility, and one that will benefit the local community for years to come.”